project banner image
Document Content

2 August 2023 AM The trench was prepared for closing photos. Closing photos were taken for Loci 24, 26, 31, 33, 36, and 37. A 7th photo model was taken of both T26 and T103. Closing photos of the trench were taken using a camera and a drone.

The trench was covered in geotextile and tarped in preparation for backfill. Soil sample bags were filled with soil and used to fill the cuts in the floor. The trench was backfilled.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book T26 2023 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2024) "t26-2023 (2023-08-02):277-278; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2023". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/fe459113-11cc-4d76-95a3-573bc6489192>

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)