project banner image
Document Content

3 July 2023


AM

The area of T26 and T103 is being debackfilled working from the southern extent. The area is being debackfilled in preparation for reopening T26 and establishing T103.


PM

The area was continued to be debackfilled.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book T26 2023 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2024) "t26-2023 (2023-07-03):27-28; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2023". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/e7a34e46-5f88-45d8-98a6-31ce0d4c7642>

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)