Document Content
4 July 2023
AM
The area continues to be debackfilled. The backfill put in place in 2022 was removed from T26. Debackfilling in the area of T103 continues. Tarp from the 1980s backfill continues to be found. The area in some spots is covered by 3 layers of tarp, which in parts is white and in parts is composed of black trash bag like plastic.
PM
Debackfilling continues in T103.
Descriptive Attribute | Value(s) |
---|---|
Entry Type | Excavation Activities |
Title | 4 July 2023 Daily Log |
Entry Year | 2023 |
Trench Book Entry Date | 2023-07-04 |
Start Page | 29 |
End Page | 30 |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
Trench Book T26 2023
Vocabulary: Murlo |
Suggested Citation
Anthony Tuck. (2024) "t26-2023 (2023-07-04):29-30; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2023". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/11003a32-414b-4c1e-9482-3d3f30b760d4>
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)