project banner image
Document Content

Daily Log

June 21 Thursday

Trees having been cleared, a cut 2 meters wide was begun in grids A, B/1-10.  Stumps and topsoil wire removed revealing a fall of large stones in grids A, B-2, 3, 4, 5.  In order to facilitate the removal of several large stumps approx. 15 large stones were cleared from the fall.

Clearing of the topsoil continued in grids A, B, C/6-10 in the afternoon.  The summit of the agger his between grids 5 and 6.  Grids 6 through 15 will be refered to as the west flank of the agger.

As expected, tile and pottery fragmetns are light in the topsoil layer which rests directly over the stones fall.  Notable is a painted sherd- possibly an imported fabric.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
JH I info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
James Hare info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

James Hare. (2017) "JH I (1979-06-21):127-128; Daily Log from Europe/Italy/Poggio Civitate/Tesoro Rectangle/Tesoro Rectangle 6,7 Doorway/1978, ID:453". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/48c1bdfc-7a79-42e7-9d32-b6688db4f73b> ARK (Archive): https://n2t.net/ark:/28722/k26h4v36r

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)