August 15, 2000
We cut a section from the South in L1015 (the wall). Now we are trying to find the borders. So I decided to go 5cm to the wall in L1014 (N of L1015). Wee dug L1014 for 5-10cm and now I am planning to dig the wall to the same level and check the baulk section. We are now leveling L1015 with L1014 and we will spray to see the lines again. If there will be no lines I will close L1015.
I saw some lines at the southern edge of the locus. So L1015 is still open then I decided to go 10-15 cm more in L1012. We started from the South-Eastern corner but after that I had to go to the hospital so I closed my trench.
Descriptive Attribute | Value(s) |
---|---|
Date | 2000-08-15 |
Year | 2000 |
Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Elvan Cobb. (2012) "F-1-2000-08-15 from Asia/Turkey/Kenan Tepe/Area F/Trench 1/Locus 1010". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/3d7c6a87-1c6c-4016-8fa2-13bb259475cc> ARK (Archive): https://n2t.net/ark:/28722/k2b27v711
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)