Document Content
Daily Log
Monday, July 23
The position of T26S was verified on the master grid by transit. The previous stake holes from T26S and T26N were used to lay out T26S Ext. by triangulation. The old datum point from T26S/N was used to take opening measurements. T26S Ext. surface is 81-97cm b.d.
Clearing the surface brush and topsoil revealed no finds. T26S Ext connects T26S and T26 completely even though T26 is not on meter points.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 2001-07-23 |
Entry Year | 2001 |
Start Page | 104 |
End Page | 105 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
SAV I
Vocabulary: Murlo |
Suggested Citation
Steve A. Vitale. (2017) "SAV I (2001-07-23):104-105; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26 South Extension/2001, ID:506". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/30fa85e5-2f1b-44fe-a5f5-e21d9a67e9a8> ARK (Archive): https://n2t.net/ark:/28722/k2bg2zn4b
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)