project banner image
Document Content

Daily Log

Monday, July 23

The position of T26S was verified on the master grid by transit.  The previous stake holes from T26S and T26N were used to lay out T26S Ext. by triangulation.  The old datum point from T26S/N was used to take opening measurements.  T26S Ext. surface is 81-97cm b.d.

Clearing the surface brush and topsoil revealed no finds.  T26S Ext connects T26S and T26 completely even though T26 is not on meter points.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
SAV I info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Steve A. Vitale info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Steve A. Vitale. (2017) "SAV I (2001-07-23):104-105; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26 South Extension/2001, ID:506". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/30fa85e5-2f1b-44fe-a5f5-e21d9a67e9a8> ARK (Archive): https://n2t.net/ark:/28722/k2bg2zn4b

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)