project banner image
Document Content

[141] 31 July 2019

 

Closing photos were taken after the trench and surrounding area was troweled and swept. The lowest points of Locus 9 and Locus 13 remained wet from rain on the 28th of July. After closing photos were taken a drawing of western baulk wall was completed.

In preparation for backfill the trench was covered with TNT material and photos were taken. The trench was then covered with soil taken from the dump to the south of the trench. Once the trench and the surrounding area was backfilled additional photos were taken.

Suggested Citation

Anthony Tuck. (2019) "T26 (2019-07-31):141-142; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2019". In Murlo. Anthony Tuck (Ed). Released: 2019-09-13. Open Context. <https://opencontext.org/documents/28e5db9c-d713-44f8-a2f1-b4659a7c1deb> ARK (Archive): https://n2t.net/ark:/28722/k2708c405

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)