5 July 2023

AM

Debackfilling in T103 continues. Sweeping up loose soil and troweling the area of T26 is occurring in the southern extent.

    The trench was triangulates using the 180E-172.5S line. The trench was laid out as a 9m x 3m rectangle with a 1.5 x 3m extension off the west baulk wall and a 2m x 2m extension off the east baulk wall. The area around T26 was baulk walled and the baulk walls in the trench were scraped. The surfaces of the trench were troweled.


PM

Baulk walling continues in T26 and sweeping from the south to the north was begun. The area was clipped to cut the vegetation around the trench and prepare the area for photos.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book T26 2023 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2024) "t26-2023 (2023-07-05):31-32; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2023". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/2278ce7f-ec04-4ede-8495-757caf0c594f>

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)