project banner image
Document Content

Daily Log

June 29, 2000

AM

Work continued on the baulk wall of the original T22 west extension trench. Locus 1 was taken down level with the work done yesterday in meters 50S 165E and 51S 165E. Once this cut was finished and the trench was level, another cut was made in meters 50S 167E ad 51S 167E. Several fragments of pottery were found and an increasing amount of terracotta.

Work stopped at 11:20 am so that the students could visit the museum.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
KLH II info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Kristin L. Hostetler info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Kristin L. Hostetler. (2017) "KLH II (2000-06-29):20-21; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 22 West Extension/2001, ID:445". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/b90d1f5d-2933-4787-9bcd-6d4b9465d9da> ARK (Archive): https://n2t.net/ark:/28722/k21265n6c

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)