Document Content
Daily Logs
Monday, August 3rd 2015
AM
Trench T 79 was backfilled. Prior to backfill, closing photographs were taken of the entire trench and closing elevations will be the same as locus 2 closing elevations.
Closing Elevations For T 79:
NW (38 S, 103 E): 184 cm BD / 27.08 m AE
NE (38 S, 106 E): 194 cm BD / 26.98 m AE
SE (41 S, 106 E): 200 cm BD / 26.92 m AE
SW (41 S, 103 E): 199 cm BD / 26.93 m AE
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 2015-08-03 |
Entry Year | 2015 |
Start Page | 97 |
End Page | 98 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
MLL III
Vocabulary: Murlo |
Suggested Citation
Melissa L. Ludke. (2017) "MLL III (2015-08-03):97-98; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 79/2015, ID:702". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/b806477b-1c12-4ad7-b634-306408cf34e6> ARK (Archive): https://n2t.net/ark:/28722/k2nv9rp0m
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)