Document Content
25 July 2023
AM
This morning work began in Locus 9 after opening elevations were taken.
NW: 28.11 mAE
NE: 28.18 mAE
SE: 28.17 mAE
SW: 28.20 mAE
Trowels and brushes were used to clean the bottom of the entire trench in preparation for closing photos. The day was eventually cut short due to intermittent rain and thunder, therefore closing photos and a closing drawing will wait until the following day of excavation. There were no bulk artifacts to count at the end of the day.
Descriptive Attribute | Value(s) |
---|---|
Entry Type | Excavation Activities |
Title | t101-2023 (KAM) excavation, p. 97-97 |
Entry Year | 2023 |
Trench Book Entry Date | 2023-07-25 |
Start Page | 97 |
End Page | 97 |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
Trench Book T101 2023
Vocabulary: Murlo |
Suggested Citation
Anthony Tuck. (2025) "t101-2023 (2023-07-25):97-97; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 101/T101 2023". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/9ba08a14-7141-4404-93e3-7c51fd9e0bf0>
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)