July 16, 1996
In the process of laying out the trench grid and locating it on the plan it was realized that the baseline was not properly oriented. The baseline was re-shot with the transit from fixed points. Then points were placed at E140 and E150 with the transit. A 90° angle was turned at E140 and a line south was established in order to lay out the trench boundaries.
Continued clearing grass in and around the area of R14.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1996-07-16 |
Entry Year | 1996 |
Start Page | 8 |
End Page | 9 |
Title | July 16, 1996 |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
AMC V
Vocabulary: Murlo |
Suggested Citation
Alexis M. Christensen. (2017) "AMC V (1996-07-16):8-9; July 16, 1996 from Europe/Italy/Poggio Civitate/Tesoro South Flank/Tesoro South Flank 0/1997, ID:355". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/8cb46085-8d74-41cc-9f75-febb1532f406> ARK (Archive): https://n2t.net/ark:/28722/k20v8rx8b
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)