project banner image
Document Content

2 July 2018

AM

De-backfill continued in EPOC IV and the workshop.

PM

Work was halted for the afternoon as a result of a half day to allow students to attend the Palio in Siena.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book KPH IV T92 2018 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2019) "T92 (2018-07-02):25-26; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 92/T92 2018". In Murlo. Anthony Tuck (Ed). Released: 2019-07-28. Open Context. <https://opencontext.org/documents/7a2d42c9-d776-4f47-94b3-038e6422f505> ARK (Archive): https://n2t.net/ark:/28722/k22b99t0k

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)