Document Content
Daily Log
June 24, 1997
A.M. Photos Taken
Brush was cleared, inpart, from the area of R15 to R13, and backfill was removed from the northwest corner and southeast corner of R13.
The master grid was exended south off PC 6 (0, E150) into the area of R14 in order to prepare for laying out a trench in the western, unexcavated portion of R14.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1997-06-24 |
Entry Year | 1997 |
Start Page | 104 |
End Page | 105 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
AMC V
Vocabulary: Murlo |
Suggested Citation
Alexis M. Christensen. (2017) "AMC V (1997-06-24):104-105; Daily Log from Europe/Italy/Poggio Civitate/Tesoro South Flank/Tesoro South Flank 0/1997, ID:355". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/6aa7bce0-450d-46d9-94f6-78fbe893701c> ARK (Archive): https://n2t.net/ark:/28722/k2z32437g
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)