Document Content
Trench Layout
Trench Layout
The boundaries of the trench were laid out using a baseline shot with the transit off the grid point PC 1 and a second baseline extending at a 90 degree angle. Using triangulation a 3x3m trench was established with the NW corner at a location of 10N/4W.
The coordinates of the four corners of CA 62 at the time of the start of the 2009 season are as follows:
NW corner: 10N/4W
NE corner: 10N/1W
SE corner: 7N/1W
SW corner: 7N/4W
A datum point with an absolute elevation of 29.75m was established on a tree located 2m east of the PC 1 baseline.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 2009-06-24 |
Entry Year | 2009 |
Start Page | 13 |
End Page | 13 |
Title | Trench Layout |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
AEG I
Vocabulary: Murlo |
Suggested Citation
Ann Elizabeth Glennie. (2017) "AEG I (2009-06-24):13; Trench Layout from Europe/Italy/Poggio Civitate/Civitate A/Civitate A 62/2009, ID:607". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/62caffbf-cb55-4db2-bd37-d15314685b1e> ARK (Archive): https://n2t.net/ark:/28722/k23j3rg2j
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)