Document Content
Daily Trench Journal
Area F, Trench 20
June 8, 2005
M. Baldi
Worked today in clearing the red soil, after documenting the collapsed brick. We noted that the bricky material spreads east from the east end. A possible wall was located near the southeast corner of the trench. Due to worker problems this morning, work on the possible wall will be suspended for now but we will continue to lower the trench.
Descriptive Attribute | Value(s) |
---|---|
Date | 2005-06-08 |
Year | 2005 |
Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Marco Baldi. (2012) "F-20-2005-06-08 from Asia/Turkey/Kenan Tepe/Area F/Trench 20/Locus 3". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/576f7a87-37b6-4c6d-fb97-da39e62af7d4> ARK (Archive): https://n2t.net/ark:/28722/k2qn63v0d
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)