Document Content
Daily Log
July 17, 1989
A.M.
Work continued in T-26 east.
P.M.
A 20cm cut was begun in meters H-I/68-70, extending the depth of the trench in these meters to 140 to 160cm. The soil in meter H/68 and the northern half of meter H/69 consisted of galestra and contained no material. The soil in the southern half of meter H/69 and in meters H-I/70-71 was dark brown and also contained a large amount of small chunks of yellow and orange plaster. One half cassetta of tile, including some plaster, and one quarter box of mixed pottery were discovered. Work was stopped at mid afternoon due to rain.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1989-07-17 |
Entry Year | 1989 |
Start Page | 111 |
End Page | 114 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
JB II
Vocabulary: Murlo |
Suggested Citation
Jon Berkin. (2017) "JB II (1989-07-17):111-114; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 27/1990, ID:146". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/4c3c8b5b-fb21-4df0-ac42-1ab8f90a2a27> ARK (Archive): https://n2t.net/ark:/28722/k2x35350d
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)