project banner image
Canalization constructed in a builder's trench cut through the gravel platform and capped. (Classification Category or Type)
Suggested Citation

Martha Sharp Joukowsky. (2007) "Canalization constructed in a builder's trench cut through the gravel platform and capped.". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/f3f358ee-e5be-4194-834d-9c07c7bc21f9>

Editorial Status
●●●○○
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)