project banner image
Preparation of the bedrock platform of the temple: quarrying and installation of the north south channels. (Classification Category or Type)
Suggested Citation

Martha Sharp Joukowsky. (2007) "Preparation of the bedrock platform of the temple: quarrying and installation of the north south channels.". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/5e2d9fdf-88f0-473a-331e-125b04aff0b4>

Editorial Status
●●●○○
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)