project banner image
Central Arch constructed, canalization blocked and channel system filled in with soil and the earth "clay" floor of the Central Arch laid. (Classification Category or Type)
Suggested Citation

Martha Sharp Joukowsky. (2007) "Central Arch constructed, canalization blocked and channel system filled in with soil and the earth "clay" floor of the Central Arch laid.". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/25eac81b-8219-464f-8c7f-1d9246d6b31e>

Editorial Status
●●●○○
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)