project banner image
Building up and leveling of the fill of the Lower Temenos and the installation of the Hexagonal Pavement. A layer of hard-packed soil indicates the level of the pavement be... (Classification Category or Type)
Documentation Note
Building up and leveling of the fill of the Lower Temenos and the installation of the Hexagonal Pavement. A layer of hard-packed soil indicates the level of the pavement bedding.
Suggested Citation

Martha Sharp Joukowsky. (2007) "Building up and leveling of the fill of the Lower Temenos and the installation of the Hexagonal Pavement. A layer of hard-packed soil indicates the level of the pavement be...". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/0de42a90-59b5-45c9-5837-06b5b1fcd7ab>

Editorial Status
●●●○○
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)