Building up and leveling of the fill of the Lower Temenos and the installation of the Hexagonal Pavement. A layer of hard-packed soil indicates the level of the pavement be... (Classification Category or Type)
Documentation Note
Suggested Citation
Martha Sharp Joukowsky. (2007) "Building up and leveling of the fill of the Lower Temenos and the installation of the Hexagonal Pavement. A layer of hard-packed soil indicates the level of the pavement be...". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/0de42a90-59b5-45c9-5837-06b5b1fcd7ab>
Editorial Status
●●●○○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)