Descriptive Attribute | Value(s) |
---|---|
Stage Description | Subterranean canalization system and ground channels installed into the prepared bedrock surface beneath the temple. |
Description | The same mortar as is on the canalization wall and is continuous, which suggests all the plaster was laid at the same time. |
Preserved Height | 0.035 m. |
Top (m) | Opening Depth: 904.533 m. |
Location | wherever there is a canalization passage. |
Phase | I |
Overlies | Bedrock. |
Bottom (m) | Closing Depth: 904.498 m. |
Underlies | Loci 23 and 22. |
Stage | Stage 1 |
Phase Description | Phase I: Preparation: 1st c. BCE subterranean canalization is installed and the bedrock leveled with a coarse yellow soil. |
Definition | Floor of the canalization |
Architectural or Soil Locus? | Architectural |
Suggested Citation
Martha Sharp Joukowsky. (2007) "Locus 25 from Asia/Jordan/Petra Great Temple/Temple/Trench 57". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/subjects/2844a661-9094-41d0-0b55-706455691c34> ARK (Archive): https://n2t.net/ark:/28722/k2zg6r358
Editorial Status
●●●○○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)