project banner image
Document Content

4 July 2024

 

AM

Debackfill continues in T26 2024. In most areas a black plastic tarp is beneath 15-20 cm of heavily compacted soil. On top of the OC2/Workshop floor woven plastic bags were cut open and placed on the surface. The bags ate covered by a ca. 10 cm of soil, followed by black plastic tarp, followed by additional backfill. 

 

PM

Debackfill in T26 2024 was completed.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book T26 2024 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2025) "T26-2024 (2024-07-04):29-30; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2024". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/f3b592fa-13d9-4f58-8509-a507521e6236> ARK (Archive): https://n2t.net/ark:/28722/k2pr87w5d

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)