Document Content
19
Daily Logs
21
4 July 2022
AM
The area of T26 and T100 was begun to be debackfilled in preparation of reopening T26 and establishing T100.
PM
The area continued to be debackfilled.
Descriptive Attribute | Value(s) |
---|---|
Entry Type | Excavation Activities |
Title | T26-2022 (NKD) excavation, p. 19-22 |
Entry Year | 2022 |
Trench Book Entry Date | 2022-07-04 |
Start Page | 19 |
End Page | 22 |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
Trench Book NKD II T26 2022
Vocabulary: Murlo |
Suggested Citation
Anthony Tuck. (2024) "T26-2022 (2022-07-04):19-22; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/T26 2022". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/ed0583a3-c438-405a-85dc-0a97ef92bb27>
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)