Document Content
Daily Log
June 14, 1979
Underbrush and topsiol cleared in F-M37-39 and N-P33-39 to adepth of 10cm. (Cut 1). Cut 2 was started in N-O35-36 and in J-M37-39, approximately 15-20 cm. deep.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1979-06-14 |
Entry Year | 1979 |
Start Page | 165 |
End Page | 165 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
FA I
Vocabulary: Murlo |
Suggested Citation
Fred Albertson. (2017) "FA I (1979-06-14):165; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 21/1979, ID:83". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/df089bd1-d32a-4b84-9308-c07ebce033b5> ARK (Archive): https://n2t.net/ark:/28722/k21g10746
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)