Document Content
Wednesday, July 4 2018
AM
Continued de-backfilling EPOC4, in preparation for aerial photography and photogrametry. Debackfilled southern wall of of EPOC4.
PM
Continued de-backfilling S wall of EPOC4 and also worked to de-backfill N wall and interior preserved floor surfaces.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Start Page | 31 |
End Page | 32 |
Trench Book Entry Date | 2018-07-04 |
Entry Year | 2018 |
Entry Type | Excavation Activities |
Trench Book Title (Paper Book) | KRK XIII |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
Trench Book KRK XIII T90 2018
Vocabulary: Murlo |
Suggested Citation
Kate Rachel Kreindler. (2019) "T90 (2018-07-04):31-32; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 90/T90 2018". In Murlo. Anthony Tuck (Ed). Released: 2019-07-28. Open Context. <https://opencontext.org/documents/d33770cb-6dd2-4e1e-b075-d849447865ec> ARK (Archive): https://n2t.net/ark:/28722/k2g168s3n
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)