Document Content
June 23, 1997
Work was begun removing backfill from the area of last year's excavations.
The dirt dump was re-established in the courtyard of the Upper Building to the north of R15-16, the same location as the previous two years of excavation.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1998-06-23 |
Entry Year | 1998 |
Start Page | 68 |
End Page | 69 |
Title | June 23, 1997 |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
AMC VII
Vocabulary: Murlo |
Suggested Citation
Alexis M. Christensen. (2017) "AMC VII (1998-06-23):68-69; June 23, 1997 from Europe/Italy/Poggio Civitate/Tesoro South Flank/Tesoro South Flank 0/1998, ID:406". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/bd6e44a8-0669-4a35-a047-9a78d85c7410> ARK (Archive): https://n2t.net/ark:/28722/k2086jk97
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)