project banner image
Document Content

Daily Log

Wednesday, June 10

A.M.

- site photos

Started work at 7 a.m.  Cleaned surface growth from trench and surrounding area.  Established the meter grids of the trench by triangulation off the wall of the Upper Building.

Commenced removal of backfill from the area o f the trench in meters K-L(M)/64-65.  The work was left unfinished and will be completed in tomorrow's work.

The backfill soil was muddy and contained approx. 40 worn pieces of tile and 10-15 badly worn pieces of ceramic.  Also found was several small fragments of charcoal and one large fragment.

Initial photographs were taken of the trench.

P.M.

Resumed clearing of backfill over meters K-L(M) 63-65.  Work halted and left unfinished due to rain.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
TT II info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Tony Tuck info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Tony Tuck. (2017) "TT II (1992-06-10):6-10; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/1992, ID:139". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/b94a09f8-0150-49fa-b49d-6848af45aa56> ARK (Archive): https://n2t.net/ark:/28722/k20v8rt7h

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)