Document Content
Daily Log
Daily Logs
Tuesday, June 28 2016
AM
In the previous four days, backfill was removed from EPOC 4, including the backfilled soil from the T-58 sounding of 2014 and 2015. This morning, backfilled soil that had fallen beneath the tarps was removed, using trowels and brushes. We took special care to remove all backfill from the W wall of EPOC 4 and from the building's NW corner, as T-86 will be located in this area.
Before scraping up all remaining backfill, opening photos of T-86 were taken, to document the state of the trench before any deposits were removed. No materials from the removed backfill were saved or documented.
Additionally, a N-S running longitudinal baseline was shot, using a transit, along gridline 91E. A datum was established in a tree located between T-57 and 58 at 27.74m A.E.
PM
Continued to remove backfill from in and around T-86, using trowels and brushes. No materials were kept.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 2016-06-28 |
Entry Year | 2016 |
Start Page | 21 |
End Page | 22 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
KRK X
Vocabulary: Murlo |
Suggested Citation
Katharine R. Kreindler. (2017) "KRK X (2016-06-28):21-22; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 86/2016, ID:713". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/b3e5fadd-1b3e-4f36-a9eb-a9a88030f3f8> ARK (Archive): https://n2t.net/ark:/28722/k2zs31r52
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)