project banner image
Document Content

Daily Log

Tuesday, June 15

A.M.

Photos taken

Continued cutting steps in meters N3-5/W 15 halfway back toward the west to make more room in bottom of trench.  Trench is finally ready for further excavation of the well.  No material was recovered during this morning's work.  Another large stone had to be removed from the structure of the well after the photographs were taken.

P.M.

Work was cancelled this afternoon due to rain.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
JBB II info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
John B. Beeby info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

John B. Beeby. (2017) "JBB II (1999-06-15):20-23; Daily Log from Europe/Italy/Poggio Civitate/Civitate A/Civitate A 42/1999, ID:366". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/add613b1-f199-4039-a7ad-05d443533c6f> ARK (Archive): https://n2t.net/ark:/28722/k25t3xc53

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)