project banner image
Document Content

July 9, 2001

* As the battery gone yesterday night I am completing and putting into data my journal the next day the 10th of July.

It is the last day of digging as trench D1 our major purpose is to take out the cobble stoned area L1013, I firstly with the suggestion of Andy took one side of the area the northern part and then the southern part. I’ve joined the northern part of this cobble stoned area with L1015, L1012(the northwestern side of the trench). after verifying that there is no other layer below then I proceeded to take out the southern side of this area I joined this part of the L1013 with the southern part of L1012. finally I erased completely the stones. My final duty was to make flat my northern baulk to see the layers before taking it off to join my trench with D2 to form D5.

Descriptive Attribute Value(s)
Date 2001-07-09
Year 2001
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-D-1-2001-07-09-A
Suggested Citation

Sibel Torpil. (2012) "D-1-2001-07-09 from Asia/Turkey/Kenan Tepe/Area D/Trench 1/Locus 1012". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/a29008d2-54c8-4148-170d-bef0c2036bd1> ARK (Archive): https://n2t.net/ark:/28722/k27m08g7z

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)