project banner image
Document Content

Page 25

Tuesday, July 5 2022

AM

Continued de-backfilling T90 and the area of EPOC4’s front porch.

PM

Continued de-backfilling. Work ended early, due to heat.

Page 26

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book KRK XV T90 2022 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2025) "T90-2022 (2022-07-05):25-26; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 90/T90 2022". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/974f63db-2758-421f-a2f2-7701dc84e4b7>

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)