project banner image
Document Content

Daily Log

Page 19 scan

Plan of Tesoro 9 with 1970 extension

Page 20 scan

T9

July 17, 1970

A new trench or rather an extension of an old one (T9) was begun in order to give this trench, that had been dug the previous year a more regular outline (see plan p.19 and cf. plan and summary NW p.172 tf). THe grid is the one used before in T9. Work started in I-K 16-18. Topsoil and one layer more was taken off. Almost nothing was found. One box of tiles dumped. In K16 a cut out. In I 17-18 a layer of small stones appeared.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
CS I info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Charlotte Scheffer info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Charlotte Scheffer. (2017) "CS I (1970-07-17):19-20; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 14/1970, ID:64". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/813f1d3e-29df-460e-bfe6-9995ecf3c303> ARK (Archive): https://n2t.net/ark:/28722/k2qn6dr56

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)