Today before beginning to work, we have taken an elevation from 4 sides of the Trench (West of the Loc6 591.091, center is 590.921, South side of the Loc6 590.861 and bottom level of the Loc5 (SW corner) 590.001). Then we have started to work. The rocks that were located in Loc5 were taken because we did not see any continuation of the rocks and its elevation was the same as loc6. After that, we have cleaned to analyze. And the result of the analyzing showed us neither connection between loc6 and loc5 or new surface.
Tomorrow we want to take spider shot then we will continue to dig.
Descriptive Attribute | Value(s) |
---|---|
Date | 2002-07-09 |
Year | 2002 |
Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Tuba Gençler. (2012) "D-7-2002-07-09 from Asia/Turkey/Kenan Tepe/Area D/Trench 7/Locus 3". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/8032ff33-5b4a-4ef8-17b0-33e36dcc4b3c> ARK (Archive): https://n2t.net/ark:/28722/k27945b0z
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)