Document Content
Monday, July 2 2018
AM
Began de-backfilling area of T90, in front porch of EPOC4. Removed backfill from T90 2017, exposing the 2017 sections, the S wall of the superimposed rectilinear building, and part of EPOC4’s S wall.
PM
No work done in afternoon. Half day taken for Palio.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Start Page | 27 |
End Page | 28 |
Trench Book Entry Date | 2018-07-02 |
Entry Year | 2018 |
Entry Type | Excavation Activities |
Trench Book Title (Paper Book) | KRK XIII |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
Trench Book KRK XIII T90 2018
Vocabulary: Murlo |
Suggested Citation
Kate Rachel Kreindler. (2019) "T90 (2018-07-02):27-28; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 90/T90 2018". In Murlo. Anthony Tuck (Ed). Released: 2019-07-28. Open Context. <https://opencontext.org/documents/60f446da-2c6c-4f2a-8060-6df01a522b33> ARK (Archive): https://n2t.net/ark:/28722/k26h4v574
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)