project banner image
Document Content

Daily Log

Wednesday, July 26, 1978

The wheelbarrow ramp was removed in B-E/52 and the area cleaned down to bedrock.  The large stones noted on Monday in E/53 are pakced against the bedrock with a heavy concentration of carbon immediately to the south.  The final project of the morning extended the cut along the east flank of the trench in A/54 up to the wall of the upper building and down to the level of bedrock.

19780161

19780161

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
SL I info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Sarah Leach info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Sarah Leach. (2017) "SL I (1978-07-26):101-104; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 22/1993, ID:411". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/3fb326be-a2d5-4d29-8c3e-002fe7e4aa96> ARK (Archive): https://n2t.net/ark:/28722/k2b56vg3s

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)