Tuesday, July 17 2018

No work done on site on Monday, July 16 - long weekend.

Heavy rains overnight left the trench too wet to excavate.  Spent the morning bailing standing water from T90 and rest of day bailing water from EPOC4, to dry out trench and building.

Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Kate Rachel Kreindler info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Kate Rachel Kreindler. (2019) "T90 (2018-07-17):107-108; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 90/T90 2018". In Murlo. Anthony Tuck (Ed). Released: 2019-07-28. Open Context. <https://opencontext.org/documents/12cf369e-32b0-4c24-a8f9-2859db2ac1df> ARK (Archive): https://n2t.net/ark:/28722/k2ms41g9p

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)