project banner image
Document Content

Daily Trench Journal

Area C

Trench 1

June 22, 2005

We are starting to take out wall 1111. We are probably below the wall now, but the wall had been slightly pedestalled. We got a good amount of pottery from within the wall and even a thin bronze pin. I am attempting to preserve the pebble surface that is below the wall. My goal is to get both walls out today and hopefully to articulate 1117 below wall 1111 and through the western half of the trench to the large stone boundary.

We achieved the removal of walls 1110 and 1111. Some stubs are left, but these will be flattened tomorrow. Then we will clean up and remove the rest of 1117 through HAP sampling methods.

Descriptive Attribute Value(s)
Date 2005-06-22
Year 2005
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-C-1-2005-06-22-A
Suggested Citation

Marie Hopwood. (2012) "C-1-2005-06-22 from Asia/Turkey/Kenan Tepe/Area C/Trench 1/Locus 1110". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/b423485c-b9c2-4039-c71c-d9784417b2a7> ARK (Archive): https://n2t.net/ark:/28722/k2rn34q63

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)