Document Content
Kenantepe 2005 Page 1
Datum: 587.95 (located to the NW of D.5)
Trench: D.5
Date: May 17, 2005
STRIKE! STRIKE! WORKERS WERE PROBLEM AND ASKING MORE MONEY THAN WHAT B. PARKER WAS PAYING.
THUS, THE WORK AT THE TEPE HAS CLOSED FOR TODAY.
Descriptive Attribute | Value(s) |
---|---|
Date | 2005-05-17 |
Year | 2005 |
Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Bekir Gürdil. (2012) "D-5-2005-05-17 from Asia/Turkey/Kenan Tepe/Area D/Trench 5/Locus 5206". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/a4875311-2e0a-492c-e845-2aebab9784b3> ARK (Archive): https://n2t.net/ark:/28722/k2v69dv4z
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)