July 2, 2001

We started cleaning a surface next to trench C1(south of it) cleaned the bushes and sweeping until they will lay out the trench with total station.

We laid the 10 x 10m trench with the total station and the baulk with measuring stick. We will start digging now but the workers are not here right now.

We start digging from the East half of the trench about 20cm (I prepared a kt bag for pottery and we will prepare the other bags as we find bones and lithics).

We are digging for an hour, we got a kt bag full of pottery (I prepared a new bag for pottery).

We found something like a fish net weight, I prepared a kt bag for small finds, and for artifacts.(Locus 40000)

We stopped digging at 11:50 for today, and then we measured again.

P.S. At the end of the day we got 15cm down from the top.

Descriptive Attribute Value(s)
Date 2001-07-02
Year 2001
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-C-4-2001-07-02-A
Suggested Citation

Elvan Cobb, Peter Cobb, Sibel Torpil. (2012) "C-4-2001-07-02 from Asia/Turkey/Kenan Tepe/Area C/Trench 4/Locus 4000". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/97a06cae-b5e8-4a4c-730b-2ff4d9ddea4d> ARK (Archive): https://n2t.net/ark:/28722/k2nz8562x

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)