project banner image
Document Content

Daily Journal

Area D

Trench 8

July 12, 2004

Today we finished cleaning the floor and brought down L11. The reason for the bringing down of L11 is that the floor L9 hits something and we suspected that it hit another wall however we could not see it very clearly and there are two largish (approx 15 cm) rocks which would have been in the middle of the wall. This requires further investigation. Not much got done today because I wasn’t feeling well and left the dig after breakfast.

Descriptive Attribute Value(s)
Date 2004-07-12
Year 2004
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-D-8-2004-07-12-A
Suggested Citation

Emily Ogle. (2012) "D-8-2004-07-12 from Asia/Turkey/Kenan Tepe/Area D/Trench 8/Locus 9". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/7c4380af-7e98-461b-3b28-71d6424d118e> ARK (Archive): https://n2t.net/ark:/28722/k2jh3jj91

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)