Document Content
July 10, 2001
Trench was "closed" today to make way for trench D5, which will merge D2 with its southerly neighbor, D1. Most of the baulk seperating the two trenches was removed today. Work regarding D2 was cleaning up the notebook. I'll need to carefully redesignate the area of L2023, L2018 and L2019 in the upcoming trench as I didn't get around to it previously.
| Descriptive Attribute | Value(s) |
|---|---|
| Date | 2001-07-10 |
| Year | 2001 |
| Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Greer Rabicca. (2012) "D-2-2001-07-10 from Asia/Turkey/Kenan Tepe/Area D/Trench 2/Locus 2018". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/5e18ff60-7f8e-4e46-9722-beb699f09a4b> ARK (Archive): https://n2t.net/ark:/28722/k2z60hj2q
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)