project banner image
Document Content

June 24, 2007

Area D

Trench 6

Jason Kennedy and Barish Uzel

Today we began by finishing the definition of floor Locus 172 in the collapsed fill of Locus 167. We began to realize that we had gone to far down in the center of the locus and had cut below the floor, but were able to uncover the floor in both the east and western portions of Locus 167. After cleaning and taking elevations we photographed the closing of Locus 167 and the opening shot of Locus 172. Bradley then took two HAP samples (KT 1 and 2) in the southeast and northwest corners of the floor. The rest of the day was consumed with baulk removal.

Descriptive Attribute Value(s)
Date 2007-06-24
Year 2007
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-D-6-2007-06-24-A
Suggested Citation

Bradley J. Parker, Catherine P. Foster, Jason Kennedy. (2012) "D-6-2007-06-24 from Asia/Turkey/Kenan Tepe/Area D/Trench 6/Locus 159". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/599ab0ca-45e3-4e69-5ee4-c4b8909c7e4c> ARK (Archive): https://n2t.net/ark:/28722/k2qc00p1c

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)