project banner image
Document Content

Daily Log

June 30, 1998

A.M.

The baseline was extended from PC6 (E150) to meter E189. From meter E189, a perpendicular line was projected towards the south (the workshop area), and a point was established at E189/S54.

P.M.

The transit was used to establish the southern wall of T26 by extending a line along S54 from E189 to E185. Using the point S54, two identical trenches were triangulated, each 2x3 meters, separated by a 2 meter baulk. For information regarding meters E186-188/S53-S54, consult PCS I .

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
JBB I info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
John B. Beeby info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

John B. Beeby. (2017) "JBB I (1998-06-30):7-9; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26 North/1999, ID:364". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/39ec025b-319c-4134-bbc1-faf3dd8f673f> ARK (Archive): https://n2t.net/ark:/28722/k2qz2hw69

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)