project banner image
Document Content
AM: Backfill was removed from the area north of the workshop (T26) where T100 was triangulated and laid out as a 2m x 6m rectangle extending 6m north from the northern baulk line of T26. The baulk walls of the surrounding backfill were cleaned and straightened and roots were clipped throughout the area. PM: The layout of T100 was swept and cleaned for photos. The surrounding areas were also swept.
Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Trench Book AXB I T100 2022 info
Vocabulary: Murlo
Suggested Citation

Anthony Tuck. (2025) "T100-2022 (2022-07-06):21-22; excavation from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 100/T100 2022". In Murlo. Anthony Tuck (Ed). Released: In prep. Open Context. <https://opencontext.org/documents/33f8fcdc-834d-4d00-a2db-11a3725ac29c>

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)