Document Content
Daily Trench Journal
Area D
Trench 4
June 26, 2007
We started today by digging down in L4122 to find the connection between the wall L4110 and the wall in D8. We ended up hitting the pit L4123 and spending time on that, while my other workman started in L4121. Nothing eventful happened in either loci.
Afternoon session:
We went out again in the afternoon to straighten the baulks. We ended up gaining about 30-50cm on either side of the trench. The updated trench dimensions with the baulk addition will be shown on tomorrow’s day plan.
| Descriptive Attribute | Value(s) |
|---|---|
| Date | 2007-06-26 |
| Year | 2007 |
| Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Catherine P. Foster, Jon Vidar. (2012) "D-4-2007-06-26 from Asia/Turkey/Kenan Tepe/Area D/Trench 4/Locus 4109". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/14cdbed6-de51-4cbc-8793-2206ece1a58f> ARK (Archive): https://n2t.net/ark:/28722/k22r3td65
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)