Document Content
Daily Log
June 25, 1980
A.M.
The winter erosion in T23:1979 Extentions (meters C-CC, 14-16) was cleaned along the west, south, and east walls. Along the north there is a "step" of approximately 20 cm. above the floor level of the trench and a 10 cm. section (moving north) was taken from this. This "step" contains tile and stone. It should be noted that pithos fragments were found in various parts of the trench.
This trench is being cleaned in order that it may be photographed and drawn.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1980-06-25 |
Entry Year | 1980 |
Start Page | 268 |
End Page | 271 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
MC III
Vocabulary: Murlo |
Suggested Citation
Matthew Caras. (2017) "MC III (1980-06-25):268-271; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 23 Extension/1980, ID:391". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/e624d407-043d-4c1d-bc94-1fa4b03c107e> ARK (Archive): https://n2t.net/ark:/28722/k2d50x86q
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)