project banner image
Document Content

Daily Log

June 25, 1980

A.M.

The winter erosion in T23:1979 Extentions (meters C-CC, 14-16) was cleaned along the west, south, and east walls.  Along the north there is a "step" of approximately 20 cm. above the floor level of the trench and a 10 cm. section (moving north) was taken from this.  This "step" contains tile and stone.  It should be noted that pithos fragments were found in various parts of the trench.

This trench is being cleaned in order that it may be photographed and drawn.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
MC III info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Matthew Caras info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Matthew Caras. (2017) "MC III (1980-06-25):268-271; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 23 Extension/1980, ID:391". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/e624d407-043d-4c1d-bc94-1fa4b03c107e> ARK (Archive): https://n2t.net/ark:/28722/k2d50x86q

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)