Open Context

Daily Log

Friday, June 18, 1993

AM: Worked in magazzino

PM: Began to remove topsoil layer in southeastern extension of the trench. Roots made work with large picks very difficult. A small cut was completed in P/Q 34 and P/Q 40, only to a few (less than 10cm) depth in each location. One pan tile fragment was noted and thrown out.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Alison Griffith. "AG I (1993-06-18):19; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 21/1994, ID:388". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/e5224bae-c39e-43aa-914f-3be94e48b930>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)