July 23, 2001
We finished taking photos with the spider, thanks to Drew and Andy. Right now we are sweeping and cleaning up the path way that has the locus# as 4012.
L4018 is now L4023, I will open a new ceramic bag for it. Bradley was here and we had a talk about the issues that need to be done with the floor. We will peel it off and will take all the ceramic pieces of, and then I will check if the rock group is still continuing under beneath.
We had to stop for breakfast. After breakfast we will articulate L4014, and I will take a few mud bricks with me to the dig house. I have changed the locus of it and now it is L4024. The soil is very soft so that is why the mud bricks are very lose.
By tomorrow I will be finished with the whole of the mud bricks and the rock group.
| Descriptive Attribute | Value(s) |
|---|---|
| Date | 2001-07-23 |
| Year | 2001 |
| Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Sibel Torpil. (2012) "D-4-2001-07-23 from Asia/Turkey/Kenan Tepe/Area D/Trench 4/Locus 4004". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/e32e3a4f-422d-4f40-51ff-3508399111a3> ARK (Archive): https://n2t.net/ark:/28722/k2w66fr3q
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)