project banner image
Document Content

Daily Log

Wednesday July 20, 1994

AM

It was decided not to excavate any further in I/20-22 so as not to weaken the wall.  Instead, excavation continued in H/I 23-24.  First a stump was removed in I/24.  Very little material was recovered from the roots.

pottery= 1/4 liter box

tile= 1/4 liter box

After the stump was removed work began on removing fill from trench T-6b in H-I/23-24.  About 5 cm had been removed when digging ended for the day.

A big rainstorm ended the day.

PM

Work in the maggazino.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
AG II info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Alison Griffith info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Alison Griffith. (2017) "AG II (1994-07-20):88-90; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 25 North Extension/1994, ID:107". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/da1f99ed-b283-4f26-81c1-3ed7d42be3ad> ARK (Archive): https://n2t.net/ark:/28722/k2x63sm18

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)